Text Description by the Architects: The Multipurpose Social Center is a project promoted by the Carballeda de Avia City Council as part of an ambitious rural revitalization plan for the Model Village of Muimenta. The initiative aims to revitalize a rural community in the process of abandonment by recovering adjacent land with high productive capacity and rehabilitating its built environment. This new model of governance seeks to improve the quality of life of its inhabitants, encourage younger people to stay and attract new residents by promoting economic activity on the land, reviving traditional trades, providing affordable housing and improving technological services.
In this sense, the Social Center is located on a plot in the highest part of the village, just above the church, and is part of a series of previous actions, including a community kitchen and laundry, the creation of temporary public accommodation, and the urbanization of certain unique spaces in the village. The program is very basic: the creation of three spaces capable of hosting everything from neighborhood activities and celebrations to a small day center or workshops where potential entrepreneurs can develop their activities.
The starting point for the intervention is an understanding of the different terraces or socalcos (the name given in Galicia to the traditional technique of building terraces in steeply sloping areas), and the decision not to alter the topographical conditions of the plot, seeking to understand the potential of the site and its surroundings. Thus, the proposal is to rehabilitate the existing dwelling on the plot, which was left in ruins after being devoured by the fires that ravaged Muimenta in 2018. This construction serves as a connection between the first two terraces and, inside, two spaces are planned—one per level—for work, talks, courses, exhibitions, or simply for being, seeking to make them as flexible and non-hierarchical as possible. These rooms are served by a core located towards the north façade, which contains both vertical communication and the toilet, storage, and general facilities.
On the other hand, in order to respond to the expansion requested in the requirements program, the decision was made to exploit the potential of the intermediate terrace, proposing a sort of multipurpose pavilion parallel to a pre-existing retaining wall, which once supported simple granite structures that the old vines climbed. Thus, a new wooden portico structure, supported by a tile roof, seeks to activate the green surface of this terrace, critically reinterpreting some of the initial premises of the ideas competition, but functioning as a reception area for those accessing the plot from its western end. The relationship between the pavilion and the existing building, as well as its independence, provides greater flexibility of use, as it allows different activities to coexist without overlapping.
Finally, the intervention is completed with the restoration of the existing heritage elements on the plot: a granary, a washing well, and the perimeter wall. In addition, minor urbanization and consolidation work is carried out on the existing uneven terrain, using some of the material found during the work inside the house, which allows certain spaces to be activated, as well as the creation of a pedestrian path connecting the two entrances to the plot.